• PROJECT: Delhi - Meerut Regional Rapid Transit System (RRTS) Corridor.
  • Client: National Capital Region Transport Corporation.
  • Contractor: Afcons Infrastructure ltd.
  • Type of bridge: Bow String Girder (M.S. High tensile Steel Bridge).
  • Bridge length: 70Mtr, 50Mtr.
  • Total weight: 2806 MT.
  • Duration: 2022-2023
  • PROJECT:  L&T -CMRL-C5-ECV 02 (Chennai Metro)
  • Client:  Chennai Metro Rail Ltd.
  • Contractor: L&T Construction
  • Type of bridge: composite girder Curve span (M.S. High tensile Steel Bridge).
  • Bridge length: 56Mtr, 49.9Mtr, 44.39Mtr, 50.9Mtr, 32.7Mtr, 37.9Mtr, 38.454Mtr, 37.9Mtr.
  • Total weight: 1891MT.
  • Duration: - 023-2024
  • PROJECT: Rail Project Sonnagar to Japla PKG-1 in Mughal Sarai Division)
  • Client: Rail Vikas Nigam Ltd.
  • Contractor: - Ashoka buildcon Ltd.
  • Type of bridge: Open Web Girder (M.S. Steel Bridge).
  • Bridge length: 72Mtr
  • Total weight: 540MT.
  • Duration: 2022-2023.
  • PROJECT: Project Lucknow Ring Road CH. 29+800 amausi (AMS) and piparasand (PPR) station.
  • Client:  National highway authority of India.
  • Contractor:  Pnc Infratech Ltd.
  • Type of bridge: Bowstring Girder (M.S. High tensile Steel Bridge).
  • Bridge length: 56Mtr
  • Total weight: 1290MT.
  • Duration:  2022-2023.
  • PROJECT:  Delhi - Meerut Regional Rapid Transit System (RRTS) Corridor.
  • Client:  National Capital Region transport Corporation.
  • Contractor:  Apco Infratech Ltd.
  • Type of bridge: Composite Girder (M.S. High tensile Steel Bridge).
  • Bridge length:  45Mtr.
  • Total weight:  758MT.
  • Duration:  2021-2022

PROJECTS: HARTEK AMPULS SOLAR BIKANER RAJASTHAN

PROJECT: BAJAJ HVPNL SONIPAT